Skip to main content

NetApp Stage KB

AUTO-ARCHIVED: Brocade Power Supply 'Not Available'

Views:
3
Visibility:
Internal
Votes:
0
Category:
metrocluster
Specialty:
metrocluster
Last Updated:

Applies to

  • Fabric MetroCluster
  • ONTAP 9
  • Brocade switch(es)

Issue

A PSU is reported in state 'not available'
Example:
FC-SW-A1:admin> chassisshow
...

POWER SUPPLY  Unit:
1
Power Source:           AC
PS Voltage input:       230.25 V
Fan Direction:          Non-portside Intake
Power Usage:
-147W
Time Awake:             6 days

POWER SUPPLY  Unit: 2
Power Source:           Not Available
PS Voltage input:       Not
Available
Time Awake:             0 days

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

This is an internal KB article and its content should not be copy/pasted and shared with people outside of NetApp. Always seek Duty Manager authentication of caller for password reset requests. If you need further assistance post a question in Knowledge Xchange