MetroCluster FC to IP transition - Option 9c Failing
Applies to
- MetroCluster
- Transition from 2-node FC to 4-node IP
- Option 9c failing
Issue
During the procedure to transition a 2-node MetroCluster FC to a 4-node MetroCluster IP, the step to run option 9c after connecting the new IP controllers to the existing shelves fails.