Data inaccessible during the Brocade switch firmware upgrade on fabric MetroCluster
Applies to
- ONTAP 9.8P18
- MetroCluster FC
Issue
- During a planned Brocade switch firmware upgrade in a MetroCluster FC environment, users experienced:Loss of connection to NAS (CIFS) file shares and applications.
- Long CP (Consistency Point) delays, causing I/O to be unresponsive for up to 90–100 seconds;CIFS “Operation Timed Out” errors.
Example EMS log output:
[CLuster1:wafl_exempt07:wafl.cp.toolong:error]: Aggregate data_aggr experienced a long CP.[CLuster1:slifc_asyncd_3:scsi.cmd.selectionTimeout:error]: Disk device switch1:9.126L1031: Adapter/target error: ... Targeted device did not respond to requested I/O. I/O will be retried.[CLuster1:bg_disk_fw_update_admin:bdfu.selected:info]: Disk switch1:9.126L1034 ... selected for background disk firmware update.