Skip to main content

NetApp Stage KB

Aggravating circumstances for the Back-to-Back scenario

Views:
1
Visibility:
Public
Votes:
0
Category:
ontap-9
Specialty:
perf
Last Updated:

Applies to

  • ONTAP 9
  • Data ONTAP 8
  • Data ONTAP 7

Answer

  • The incoming workload (continuous or burst) is greater than what the storage appliance is configured to handle (commonly this includes using slower drives for production loads).
  • Inefficiencies in data layout cause excessive internal systems overhead(usually due to unaligned IO in LUNs or VMDK storage objects).
    • If either of the above circumstances exists, they absolutely must be corrected in an effort to alleviate future performance issues with the storage controller.
    • If the issue is due to unaligned IO on LUNs or VMDK storage objects, this should be the initial focus for addressing the possible performance issues.

Note:

  • Back-to-Back CPs are identified by a 'B' or 'b' in the CP Type column of sysstat output, not simply seeing CPs start in the next sample after one completes.
  • If you are experiencing a performance problem with workload, throughput or latency, then please open a case with NetApp Global Support.

Additional Information

additionalInformation_text

 

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.