Skip to main content
NetApp Stage KB

Brocade Unable to do Logical Switch Management operations – “system is not ready”

Views:
Visibility:
Public
Votes:
0
Category:
fabric-interconnect-and-management-switches
Specialty:
brocade
Last Updated:

Applies to

  • Fabric OS (FOS) v9.0.1a
  • Brocade switch

Issue

  • Attempting to perform logical switch management operations (e.g., lscfg --config) on a Brocade G630 switch running Fabric OS v9.0.1a fails with the following error:
        lscfg: The system is not ready for Logical Switch management operations. Please try again shortly.
  • The hashow command may show HA state as “not in sync” or “not in operation system”.

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.